Questions, answered straight

Pond & Stock Pond Construction FAQ

What people ask before they hire us for pond & stock pond construction. If yours isn't here, call or fill out the form, we'll answer it.

Q01How big a watershed does a stock pond need to hold water?
A rough East Texas rule is 10 to 20 acres of upslope watershed for every surface acre of pond. Under that, it won't recover from a dry summer; over that, the spillway has to handle more overflow. We walk the land and size the bowl to what the watershed actually delivers.
Q02Why won't my pond hold water?
Usually the bowl was never compacted to seal, or it sits on sandy or caliche soil that doesn't hold. On clay, proper compaction in lifts seals it; on sand you need a clay liner or bentonite. We test the soil before bidding so the seal is a known cost, not a surprise.
Q03How much does it cost to build a stock pond?
It varies with size, soil, and whether the spoil is spread on site or hauled off. A pond you can drive a truck to with clay that seals is one number; a sandy site needing a liner is another. We quote after walking the watershed, soil, and access, never over the phone.
Q04Do you build ponds around Cedar Creek Lake and the lake country?
Yes, we work the Cedar Creek lake belt, Mabank, Gun Barrel City, Athens, and Kaufman County regularly. Lake-area and shoreline-adjacent work can trigger setback rules, which we coordinate as part of the scope.
Q05How deep should a stock pond be in East Texas?
A stock pond in East Texas generally wants a deepest point of 8 to 12 feet so it beats summer evaporation and holds through August. Shallow, wide ponds lose water fast and grow algae; a deeper bowl with steeper sides holds longer and stratifies better for fish. We set depth to your soil, watershed, and use.
Q06How long does it take to build a pond?
A small stock pond can be dug in a few days; a larger pond with a dam, spillway, and clay liner runs one to two weeks depending on size, soil, and haul. Access and what happens to the excavated material affect the timeline most. We give a real schedule after walking the site.
Q07Can you fix a pond that won't hold water?
Yes. We renovate leaking or silted-in ponds: re-compacting or lining a bowl that won't seal, deepening one that went too shallow, rebuilding a failed dam or spillway, and clearing accumulated silt. We find why it failed first, because a re-dig that repeats the original mistake just leaks again.
Q08Do I need a permit to build a pond on my property?
On private rural East Texas property, a stock pond for agricultural use usually needs no permit, though work near a creek, wetland, or lake shoreline can trigger review. Cedar Creek and other lake-adjacent sites fall under setback rules. We flag what your specific site and location require before we dig.

Get in Touch

Ready to Start
Your Project?

Call or send a message. We respond within one business day and come to you for the estimate, no charge, no obligation.

  • Free on-site estimates
  • Response within 1 business day
  • Licensed & insured

Step 1 of 5

What's your first name?

So we know who we're talking to.